MP Contracting performed the removal of the granite slab and then modified the pony wall to re-install the granite at the new height. The overall height reduction was approximately 8 inches. By lowering the slab just proud of the existing granite slab, it allowed for a 1" parameter around the sink to help contain any water run off.
The new look provided a much cleaner appearance.
The project took approximately 8 hours to complete.